Authorization Write us Site map

 

 

  2007

 

 

PDF
(17,1 )

     

 

 

  2008

 

 

PDF
(6,1 )

     

 

 

  2009

 

 

PDF
(2,5 )

 

 

  2010

 

 

PDF
(806 )

     

 

 

  2011

 

 

PDF
(172 )

     

 

 

  2012

 

 

PDF
(806 )

     
Adobe Flash Player 9 .
Flash Player
 /  Products and services /  Services /  HARPS Certification Test Center

HARPS Certification body


I. Content of documents, submitted to BTR by the Applicant together with the application for TR certification under the scheme 3 (Serial production)

Scheme 3 is applied for certification of typical sample of TR and provides the conduction of production tests in testing division of the manufacturer and field testing on the installation site or laboratory testing in TL (TC) on samples of TR that received from the manufacturer, on compliance with regulatory requirements. There conducted the TR production condition survey. The Certificate of Conformance is issued for a period of 3 years. At reception of the compliance certificate on TR type the Applicant is obliged to conclude the agreement with CB on delegation of the right of libeling the TR, empty TR boxes and transportation documentation with knowledge character. In the agreement are established the terms and conditions of conducted subsequent inspection checkup.

At conduction of type certification is necessary to submit the package of documents in following structure:
- technical documentation (technical description, user's manual,  installation and operation manual, etc.);
- regulatory documents (GOST, OST, TU, etc.) in which are established the technical requirements to TR and methods of their test;
- copy of certificate on quality management system (if any);
- conclusion of Uzbekexpertize on FEACN code

For certification procedure of radio-electronic facilities (REF) and high-frequency devices (HFD) to the claim should be additionally enclosed the permission of CEMC for operation of REF and HFD.

All documents should be represented in the State or Russian languages, in the original or in the confirmed copy.


II. Contents of documents, submitted to BTR by the Applicant together with the application for R certification of under the scheme 7 (for lot)

The scheme 7 - is applied at certification of a lot or individual copy of TR and provides the conduction of field testing on installation sites or testing laboratories n TL (TC) accordance to regulatory requirement. The compliance certificate extend unlimited.

At conduction of certification of lot or individual copy it is necessary to submit the package of documents in following structure:
- technical documentation (technical description, user's manual,  installation manual and operation, etc.);
- regulatory documents (GOST, OST, TU, etc.) in which are established the technical requirements to TR and methods of their testing;
- supplementary documents (invoice, air, railway or bill of lading, certificate of origin, customs freight declaration etc.);
- conclusion of Uzbekexpertize on about FEACN code

For certification procedure of radio-electronic facilities (REF) and high-frequency devices (HFD) to the claim should be additionally enclosed the permission of CEMC for operation of REF and HFD.

All documents should be submitted in the state or Russian languages, in the original or in the confirmed copy.

Application 1
(MS-Word Document, 35KB)
 
Application 2
(MS-Word Document, 35KB)